What Is PCC in Construction? Step-by-Step

What Is PCC in Construction? Step-by-Step

PCC — Plain Cement Concrete — is the levelling bed laid before footings and below floors. It has no reinforcement but plays an important role.

Why PCC matters

  • Gives a clean, level surface for steel and formwork.
  • Stops footing concrete from losing water into the soil.
  • Protects reinforcement from direct soil contact.

Typical mix

1:4:8 (M7.5) or 1:3:6 (M10), usually 75–100 mm thick, as specified by your engineer.

Step by step

  1. Excavate and compact the base.
  2. Lay anti-termite treatment if specified.
  3. Fix level pegs and shuttering.
  4. Pour, compact and level the concrete.
  5. Cure for at least 7 days before marking footings.
#plain cement concrete#pcc ratio#foundation bed
EcoFrame Engineering Desk

Written and reviewed by our site engineers. Every guide is checked against current IS codes and what we actually see on Bengaluru & Mysuru sites.

Keep reading

Related guides

All articles
Next step

Tell us about your plot.

Size, location and a rough budget is enough to start. You get an itemised estimate and an honest timeline — no obligation.