Choose the way you want to build
A ready package for speed, a fully customised BOQ for control, or design-only services if you already have a builder. Whatever you choose, the numbers are on paper first.
- 160 audits
- BOQ cost lock
Three ways to work with EcoFrame
Turnkey construction packages
Three curated packages with pre-selected brands and specifications. The fastest, simplest way to build with a fixed price.
Explore packagesBOQ-based construction
Choose every brand and grade line by line. Full control, full visibility, still a fixed contract price.
How BOQ worksArchitecture & interiors
Climate-responsive architecture, structural design, 3D visualisation and turnkey interiors.
Design servicesWhat a line-item BOQ looks like
Here is a short extract from a real G+1 BOQ. Every quotation we send is this detailed — usually 400+ lines.
| Item | Specification | Qty | Unit |
|---|---|---|---|
| Reinforcement steel | Fe 550D TMT, Tata Tiscon / JSW | 8.6 | MT |
| Cement | OPC 53 / PPC, UltraTech / ACC | 1,240 | Bags |
| Concrete | M25 RMC, slab & beams | 96 | m³ |
| Walls | 200 mm AAC blocks, Magicrete | 142 | m³ |
| Waterproofing | Dr. Fixit Pidifin 2K, terrace | 1,150 | sq ft |
| Plumbing | Ashirvad CPVC, Jaquar fittings | 1 | Lot |
Everything a home needs, under one roof
New home construction
Independent houses, villas and duplexes.
Rental & commercial
Rental units, PG buildings and showrooms.
Built for returns
Layouts optimised for rentable area, separate metering and low maintenance.
Talk to usRenovation & extension
Add a floor, rework a layout or retrofit.
Structure first
Load assessment before we add a single floor — then we build it right.
Book site visitThings homeowners ask us first
Still unsure? Call a project engineer — no sales script, just straight answers.
Everything from soil test, architecture and structural design, approvals support and construction through to plumbing, electricals, flooring, painting and handover. You get one contract, one point of contact and a fixed BOQ.
Every quotation is a line-item Bill of Quantities — brand, grade and quantity for each material. The price is locked in the agreement. Costs only change if you change the scope, and every change is priced in writing before it is executed.
A typical 30×40 G+1 home takes 9–11 months from groundbreaking to handover. G+2 homes take 11–14 months. Your agreement carries a stage-wise schedule with a delay-penalty clause.
You get access to our client portal with daily photo updates, a live payment schedule, quality-check reports and a direct line to your project engineer. Most clients visit once a fortnight; many build from abroad.
Every EcoFrame home is designed for passive cooling, rainwater harvesting and low-VOC finishes by default. Solar, greywater recycling and AAC/CSEB walls are options you can add — we will show you the cost and payback of each.
Yes. Our design studio takes on standalone architecture, structural design and 3D visualisation projects. If you later build with us, the design fee is adjusted against the construction contract.